Negotiable
The date of payment from buyers deliver within days
Beijing
Long-term effective
2017-11-28 10:52
155
Company Profile
By certification [File Integrity]
Contact:goldmak(Mr.)
Email:
Telephone:
Area:Beijing
Address:Xialang Industrial Park, Heshuikou Community, Guangming New District, Shenzhen, Guangdong, China (518000)
Website: http://goldmak.shanxismy.com/
| Size | Customized |
| Printing color | Customized |
| Material | wood |
| Design | with lots of experience we can assist on both structure and graphic design |
| File format | AI, PSD, PDF, CDR. |
| Payment | T/T or L/C at sight |
| Logo | Sticker or Printing |
| Surface Treat | Paint or Powder Coating |
| Inco. Terms | FOB,CIF |
| Transport methods | by sea, by air, express delivery |
| Sample lead time | about 7-10 working days after payment and artwork confirmed |
| Production lead time | about 20-25 working days after sample/color proof and deposit confirmed |

Single-phase 5A Thyristor Regulator
price:Negotiable

Three-phase Thyristor Voltage Regulator
price:Negotiable

Three-phase Two-wire Thyristor Power Regulator
price:Negotiable

Single-phase Thyristor Current Regulator
price:Negotiable

Single-phase 5A Thyristor Regulator
price:Negotiable

Single-phase 50A Dual-communication SCR Controller
price:Negotiable